ANDINO Hydropower (Germany)

Non-destructive testing / inspections of Kaplan, Francis and Pelton turbines as well as other equipment for hydroelectric power plants and penstocks.

Germany:

Goldisthal power plant: 100% inspection – UT and MT 4 welded ball valves weighing 130 t each

Italy:

Paisco Power plant, Pallanzeno Power plant, Albano Dongo Power plant, Verampio Power plant

Norway:

Power plant Leirfossene: 4 Francis turbines

Borregard power plant, Nea power plant, Wamma power plant, …

Nepal:

Khimti power plant: Revision of the pressure pipeline

Austria:

Kirchbichl power plant, Dorferbach power plant, Naturno power plant, …

TIWAG-Tiroler Wasserkraft AG (Austria)

Power plant Achensee: Supervision of the tests – 100% UT and MT Testing of the renewed penstock; Testing of forged welded fuses (water gas) – UT / PE and UT / PA testing

Bruckhäusl power plant, Finsing power plant, Heinfels power plant: Non-destructive testing of hydromechanical plants

Kaunertal power plant: testing of an existing pipeline (including UT / PA and UT / TOFD testing) and a new project pipeline (length 2.4 km, diameter between 4.3 and 5.5 m)

Kraftwerk Imst: non-destructive testing in the course of sanitation after a fire in the pipeline, implementation of quality assurance measures

Power plant Brennerwerk: works for the quality assurance in the general repair of the penstock

Other important references

ARGE – Verbund Hydro Power GmbH + Salzburg AG für Energie, Verkehr und Telekomunikation (Austria)

Salzach power plant Gries: quality assurance

Vorarlberger Illwerke AG (Austria)

Obervermuntwerk II: Francis turbines, material testing, monitoring and consulting

Pöyry Energy

Power plant SAMANALA (Sri Lanka): regular testing of components of hydromechanical equipment

VA TECH-ESCHER WYSS (Germany)

FIERZA power plant (Albania): periodic testing on hydromechanical components